skip to main content skip to main menu
Scroll

Projects
~ Ngā kaupapa mahi

project arrows

Taradale Second Reservoir

Planning Started: 2011
Construction Started: February 2016
Completion expected: July 2016

A second reservoir in Taradale was installed in 2016 to increase water storage as well as cater for future urban development within Napier.

The reservoir holds 9.2 million litres and is located on the same site as the existing Taradale Reservoir above Tironui Drive (which has a similar capacity) and will hook directly into the water supply network.

 

Related Documents

There are no documents related to this page.

Related Pages

There are no pages related to this page.

Disclaimers and Copyright
While every endeavour has been taken by the Napier City Council to ensure that the information on this website is accurate and up to date, Napier City Council shall not be liable for any loss suffered through the use, directly or indirectly, of information on this website. Information contained has been assembled in good faith. Some of the information available in this site is from the New Zealand Public domain and supplied by relevant government agencies. Napier City Council cannot accept any liability for its accuracy or content. Portions of the Napier City Council information and material on this site, including data, pages, documents, online graphics and images are protected by copyright, unless specifically notified to the contrary. Externally sourced information or material is copyright to the respective provider.

© Napier City Council - www.napier.govt.nz / +64 6 835 7579 / Fax: +64 6 835 7574