This is issued when a new entity takes over an existing licensed premises and wishes to continue the sale and or supply of liquor until their own licence is issued. There must be a person with a manager's certificate on duty and a temporary authority can’t be issued to a club.

General guidelines

Applications for building and planning certificates should be lodged at the same time as the temporary authority application. Where this is not possible they must be lodged within one month after the temporary authority has been granted.

Where applications are lodged at the same time the temporary authority may be issued for a period of three months. If the applications are not lodged within this timeframe the temporary authority will only be issued for a period of one month.

A temporary authority may be renewed where there is a justifiable reason for delay in the substantive licence application. There is a fee for any subsequent temporary authority applications and it is non-refundable.

The processing timeframe is can be up to 25 working days.

Apply for a Temporary Authority

You need to provide all the required information when you lodge the application to avoid a delay in processing. (Note: To obtain a second Temporary Authority the applicant must have lodged a substantive licence application).

You can apply for a Temporary Authority by following the step below or use the online form:

Application for a Temporary Authority - Online form

Step One:

  • Download and complete the liquor licensing temporary authority application form at the top of this page.

 Step Two:

  • Include all required supporting information as described in the application form.

 Step Three:

  • Send your application with the fee to:

The Secretary, District Licensing Agency, Napier City Council, Private Bag 6010, Napier 4142

Building and planning certificates

Planning Certificate under the Resource Management Act 1991

The planning certificate, when granted, confirms that the proposed use of the premises meets requirements of the Resource Management Act 1991.

  • There is a fee.
  • Takes approximately 5-10 working days to process applications should include all supporting information and documentation, particularly planned usage of floor areas for ALL buildings on site, proposed or existing opening hours and parking requirements for each activity on site. Details of what's required are included on the application form.

 Building Code Certificate

This certificate, when granted, confirms that the proposed use of the premises meets requirements of the Building Code.

  • There is a fee.
  • Takes approximately 5-10 working days to process.
Loading...

Napier City Council - Copyright © 2024 Napier City Council

Disclaimers and Copyright
While every endeavour has been taken by the Napier City Council to ensure that the information on this website is accurate and up to date, Napier City Council shall not be liable for any loss suffered through the use, directly or indirectly, of information on this website. Information contained has been assembled in good faith. Some of the information available in this site is from the New Zealand Public domain and supplied by relevant government agencies. Napier City Council cannot accept any liability for its accuracy or content. Portions of the information and material on this site, including data, pages, documents, online graphics and images are protected by copyright, unless specifically notified to the contrary. Externally sourced information or material is copyright to the respective provider.

© Napier City Council - www.napier.govt.nz / +64 6 835 7579 / info@napier.govt.nz